Centeline GroupCENTELINE GROUP
Could your next factory cost less? Explore Batu Kawan, Penang, Malaysia

Why Batu Kawan: the key facts

Wages

Minimum basic salary RM1,700 a month (about US$460), excluding overtime, allowances and employer contributions.

Incentives

Eligible manufacturers may get a 0%–10% special corporate tax rate, or an investment tax allowance of up to 100%, subject to MIDA approval.

Neighbours

Major US manufacturers already in Penang include Micron, Lam Research, Boston Scientific, Dexcom and Western Digital.

Supply chain

An established ecosystem for semiconductors, automation, precision engineering and medical devices.

Incentive rates: MIDA, New Incentive Framework guidelines (2026). Final terms depend on each project.

Compare industrial land prices: Penang vs Johor vs Klang Valley (2025–2026) →

Exclusive · For rent · Batu Kawan

A new 1-acre factory in Batu Kawan, ready for its first tenant

Hi, I'm Crystal Tee. I've worked on factories and industrial land in Penang since 2015. This one is a brand-new detached factory with its own 2-storey office, on a full acre inside Batu Kawan Industrial Park. The owner has given it to us exclusively, so you deal with me directly.

23,188 sq ftBuilt-up
1 acreOwn lot
48 mClear span
400 AUpgradable power
ExclusiveFor rentNewly built · CCC pending

Brand-new detached factory with 2-storey office

Batu Kawan Industrial Park, Penang

Rent: let's talk
I'd rather go through the rent, deposit and term with you properly than put a number here. Call or WhatsApp me on 016-559 6624.

Also for sale: RM20,000,000, excluding PDC consent fee

Exclusive listing: Centeline Group is the only appointed agent. No other agent is authorised to market this property. Agents may co-broke only with our prior written agreement.

Approved building plans and title documents are available on request.

Rent is per month on built-up area and subject to contract. Deposit, term and fit-out terms on request. All details are subject to final confirmation by the owner.

Land
1.0 acre (43,560 sq ft)
Built-up
23,188.80 sq ft (2,154.31 m²)
Production / office
15,758 sq ft / 7,430 sq ft
Height
8.93 m to apex, 5.50 m eaves
Clear span
48.0 m × 29.96 m
Power
400 A, upgradable
Floor loading
2 t/m², power-float slab
Loading
2 loading bays, 4 roller shutters 4.88 × 4.88 m
Parking
24 cars (incl. 1 OKU), 24 motorcycles, 3 lorry bays
Site
Guard house, electric gate, full concrete apron
Tenure
PDC leasehold

Questions people usually ask me about this one

How big is it, really?

23,188 sq ft built-up. That's about 15,758 sq ft of production floor plus 7,430 sq ft of office over two floors, on its own 1-acre lot. No shared walls with anyone.

Can I bring in heavy machines or high racking?

The floor takes 2 tonnes per square metre, and the roof goes up to 8.93 m at the apex (5.50 m at the eaves). The hall is 48 m by about 30 m with no columns in the middle, so you can lay it out however you like.

What about power?

400A now, upgradable on application. If you know you'll need a lot more from day one, tell me early and I'll check it with the owner before you commit.

Can containers get in and turn around?

Yes. There are two loading bays, four 4.88 m roller shutters, and concrete all the way round the building. Parking is 24 cars, 24 motorbikes and 3 lorries, behind a guard house and electric gate.

Is it ready?

The building is up, as you can see in the video. We're waiting for the CCC, so this is a good time to talk if you're planning a move in the next few months.

Who is it good for?

Suppliers to the semiconductor and medical-device plants around Batu Kawan, light assembly and test, and logistics companies that want to be near the bridge. If you need much more space or power, call me anyway. I have other factories in Penang and Kedah.

Coming from Singapore, China or Taiwan?

A lot of the companies setting up in Penang are expanding from Singapore, China and Taiwan, so I'm used to working with teams who aren't here yet. Here's how I usually do it.

  • Same time zone. Penang is GMT+8, the same as Singapore, Shanghai and Taipei, so we can talk in your working hours.
  • English or Mandarin, whichever is easier for your team.
  • A live video-call walkthrough of the factory before you book a flight, so you only fly in once you're sure it's worth it.
  • When you do come, I'll line up the viewing and the meetings so the trip is used well.

From overseas, call or WhatsApp me on +60 16-559 6624.

Your neighbours

Batu Kawan Industrial Park is home to facilities of, or linked to, seven S&P 500 companies, alongside listed Malaysian manufacturers and global logistics operators.

Your neighbours: Batu Kawan Industrial Park

View Batu Kawan Industrial Park on Google Maps →Company names are for location reference only and do not imply any endorsement or relationship. Index membership as at October 2026.

Site photos

Front elevation and main entrance
Front elevation and main entrance
Gated frontage, guard house and parking
Gated frontage, guard house and parking
Side elevation and perimeter driveway
Side elevation and perimeter driveway
Rear yard and loading area
Rear yard and loading area

Rather type than call?

Leave your details below and I'll get back to you myself. A few quick answers help me bring the right plans when we meet.

Aerial view of an industrial areaAlso exclusive in Kulim, Kedah91,247 sq ft factory and warehouse for rent next to Kulim Hi-Tech Park. 1,000A, 25 ft ceiling, LMW. Rent on request.See the Kulim factory →

Crystal Tee · Founder & Director, Centeline Group · 016-559 6624

Office: 04-285 1493 (Mon–Fri, 8:30am–6pm)

Marketed by Crystal Tee, REN 26151, IQI Realty Sdn Bhd (Penang) E(3)1417/4. Listing updated 2026-10-15.