
Large factory and warehouse for rent in Kulim
Kulim Industrial Estate (Kawasan Perusahaan Kulim), Kedah, next to Kulim Hi-Tech Park
Exclusive listing: Centeline Group is the only appointed agent. No other agent is authorised to market this property. Agents may co-broke only with our prior written agreement.
Rent is per month and subject to contract. Deposit, term and handover condition on request. All details are subject to final confirmation by the owner.
- Built-up
- 91,247 sq ft (8,477 m²)
- Land
- 152,889 sq ft (about 3.5 acres)
- Power
- 1,000 A
- Ceiling height
- 25 ft
- Loading
- 2 loading bays
- Office
- 2 office areas inside the building
- Utilities
- Water, gas and internet available
- Customs
- Operating as an LMW facility; new tenants apply for their own LMW licence with Royal Malaysian Customs
- Tenure
- Leasehold, industrial
- Suits
- Manufacturing, assembly, warehousing and logistics
Your neighbours
Kulim Industrial Estate sits beside Kulim Hi-Tech Park, Malaysia's first high-technology park. Companies operating nearby include:
- Jabil
- Amdocs
- Compart Systems
- Miyao-Toki
- Q-Press
- Berjaya Packaging
- Sime Darby Industrial
Company names are for location reference only and do not imply any endorsement or relationship.
Photos








Some exterior images are digitally enhanced and signage is for illustration only. Please view the site to confirm its current condition.
Common questions about this Kulim factory
How much is the rent for this Kulim factory?
Please contact us for the rent. It is for rent only, not for sale. Deposit, term and handover condition are given on request and subject to contract.
How big is the factory and warehouse?
91,247 sq ft (8,477 m²) built-up on 152,889 sq ft of land (about 3.5 acres), with a 25 ft ceiling, two loading bays and two office areas inside the building.
How much power does it have?
1,000 A. Water, gas and internet are also available.
Can I operate a Licensed Manufacturing Warehouse (LMW) here?
The building is currently operating as an LMW facility. A new tenant applies for its own LMW licence with the Royal Malaysian Customs Department.
Where is it?
In Kulim Industrial Estate (Kawasan Perusahaan Kulim), Kedah, next to Kulim Hi-Tech Park. Kulim is linked to Penang mainland by the Butterworth–Kulim Expressway. The exact address is shared when you arrange a viewing.
How do I arrange a viewing?
Call or WhatsApp Crystal Tee, or send the form on this page. She replies personally within one working day with the layout, terms and viewing times. This is an exclusive listing, so Centeline Group is the only appointed agent.
Ask about the Kulim factory
Leave your details and I'll reply myself within one working day with the layout, terms and viewing times.