Centeline Home 百特地产 CENTELINE GROUP
EN

Industrial property · Penang & Kedah

Foreign investor Q&A: renting or buying a factory in Malaysia

The ten questions foreign manufacturers and investors ask us most, answered plainly. If your question is not here, send it to Crystal on WhatsApp.

Send my requirement on WhatsAppCall +60 16-559 6624

Handled personally by Crystal Tee, REN 26151 · IQI Champion 2024 & 2025

Buyer's guide & calculators →
Foreign investor Q&A: renting or buying a factory in Malaysia

Factories: renting or buying

01Can a foreign company rent or buy a factory in Malaysia?

Yes. Most foreign investors set up a Malaysian private limited company (Sdn Bhd), which can be 100% foreign-owned for manufacturing. The company can rent any factory. It can also buy industrial property, subject to state rules and a minimum value of RM1 million per unit for foreign interests. A manufacturing company buying industrial land does not need Ministry of Economy approval. Read more →

02How is factory rent calculated, and what is included?

Rent is usually quoted per square foot of built-up area per month. As a guide, Penang Island is around RM3.50–4.50, the Penang mainland RM2.20–3.50 and Kulim RM1.80–2.50, depending on specification and power. Confirm whether the office, mezzanine, guardhouse and covered loading areas are charged at the same rate, and whether any service charge applies. Read more →

03How much power does a factory have, and can it be upgraded?

Supply is usually described in amps, for example 400 A or 1,000 A at 415 V, or as a high-voltage supply of 11 kV or 33 kV for larger plants. Upgrades are applied for through TNB. Cost and timing depend on the capacity you need and whether a new substation is required, so check this before you sign. Read more →

04What will I pay upfront?

To rent: the security and utility deposits and advance rent agreed with the landlord, stamp duty on the tenancy agreement, and legal fees if a lawyer prepares it. To buy: usually a 10% deposit on signing, stamp duty on the transfer, legal fees and any consent fees. Foreign individuals and foreign-owned companies may pay a higher stamp duty rate, so confirm with your lawyer. Read more →

05How long before I can start production?

For a ready-built factory you rent, often a few months: signing the lease, fit-out, and the approvals your process needs, such as fire safety (BOMBA) and environmental approvals. For a purchase, approvals usually take an estimated 6–9 months after signing the SPA, followed by fit-out of an estimated 3–6 months. Timing is never guaranteed. Read more →

06Do I need a MIDA manufacturing licence, and can I get tax incentives?

A manufacturing licence is required if your company has shareholders' funds of RM2.5 million or more, or 75 or more full-time employees. Since 1 March 2026, new incentive applications fall under MIDA's New Incentive Framework, with a choice of a Special Tax Rate or an Investment Tax Allowance. Apply before production starts. Read more →

07Can I import raw materials and machinery duty-free?

Export-oriented manufacturers can operate in a Free Industrial Zone, such as Bayan Lepas or Seberang Perai in Penang, or apply for Licensed Manufacturing Warehouse (LMW) status elsewhere. LMW is normally for companies exporting at least 80% of output with mainly imported inputs. The building must also meet customs requirements, which we check for you. Read more →

08How do I know the title is clean and my process is allowed there?

Before you commit we check the title, tenure and remaining lease years, encumbrances, the land use category and zoning, and any PDC or landlord consent fees. The Department of Environment must accept your process for the site, and some activities need an Environmental Impact Assessment. Read more →

09Can I hire workers and bring in my own managers?

Penang and Kedah have a deep pool of skilled electronics and manufacturing workers. Manufacturers can apply through MIDA for expatriate key posts and term posts, and foreign workers are subject to current government policy. Budget for the minimum wage, which is set to rise from RM1,700 to RM2,000 from June 2027. Read more →

10What lease terms should I expect, and can I take profits out of Malaysia?

Industrial leases usually run two or three years with an option to renew; larger built-to-suit factories often run longer. Agree in writing any rent-free fit-out period, reinstatement at the end, and who pays assessment, quit rent, insurance and structural repairs. Malaysia allows foreign investors to repatriate capital, profits and dividends freely.

Setting up a logistics company in Malaysia

These answers are for an initial client discussion. Licensing can depend on the exact services, goods and location.

11Should we establish a Malaysian company or register our overseas company as a branch?

A Malaysian Sdn. Bhd. is a local company with its own legal identity. A branch is an extension of the overseas company. The better structure depends on liability, tax, licensing, and how the parent company wants to operate. We should compare both against your business plan before filing with SSM.

12Can our Malaysian company be 100% foreign-owned?

For an International Integrated Logistics Services (IILS) company, MIDA lists 100% foreign equity ownership as eligible. This is for an integrated operation: the listed criteria include warehousing, transportation, and freight forwarding, plus distribution/supply-chain management or related value-added services; at least 20 commercial vehicles; and at least 5,000 m² of warehouse space. The company must also employ a majority of Malaysians, use Malaysia as a logistics hub, and have substantial ICT infrastructure. Approval is still required. These criteria do not automatically apply to every ordinary warehouse or logistics business.

13Do we need a Malaysian-resident director and registered office?

For a Malaysian private company, SSM requires at least one director who ordinarily resides in Malaysia and a registered office in Malaysia. The first company secretary must be appointed within 30 days of incorporation; SSM says the secretary must be a Malaysian citizen or permanent resident who ordinarily resides in Malaysia and is qualified or licensed.

14What licences will our business need?

It depends on the services:

  • Operating commercial goods vehicles: check the APAD operator licence and vehicle permits.
  • Customs warehousing: check whether a Customs warehouse licence is needed.
  • Freight forwarding or customs agency: confirm the route and requirements with Customs. MIDA says successful IILS applicants are granted a Freight Forwarding Agent/Customs Agent licence by Customs after approval.

There is no single licence that automatically covers all logistics activities.

15Can we lease any warehouse for our operations?

Not safely without checking first. Before signing, confirm the premises’ approved use, local authority requirements, building and fire-safety status, and suitability for the goods and activities. Tell us whether you plan to store ordinary cargo, food, chemicals, or controlled goods, and whether you will operate trucks from the site. Those details can change what needs approval.

16Can we store imported goods before paying customs duty and tax?

Potentially, using an approved Customs arrangement. Customs describes a Licensed Warehouse as a facility for approved dutiable goods where duty and tax can be deferred until the goods are released for local use or re-export. The company and site need to meet Customs’ licensing conditions.

17Can our foreign directors or staff work in Malaysia?

They need the correct immigration approval and pass before working. The company must be eligible and registered with the Expatriate Services Division (ESD), and the position must receive the required approval. For Employment Pass applications submitted from 1 June 2026, ESD lists minimum monthly salaries of RM20,000 for Category I, RM10,000–RM19,999 for Category II, and RM5,000–RM9,999 for Category III. Categories II and III have succession-plan conditions.

18What do we need to do when hiring employees?

Register as an employer and set up payroll before hiring. Check EPF, SOCSO, EIS where applicable, tax deductions, employment contracts, and work authorisation for foreign workers. EPF says employer registration is due within seven days of becoming liable to contribute; PERKESO also requires eligible employers to register and contribute for employees.

19What taxes should we budget for?

Plan for company income-tax filing and payments, and check whether your services require SST registration. HASiL says a company incorporated online through SSM’s MyCoID is automatically registered for a company Tax Identification Number. MySST lists logistics services at 6%, but that does not mean every logistics charge is taxable: the service type, registration threshold, and any applicable exclusions must be checked.

20What documents and information should we prepare to start?

Prepare:

  • Parent-company incorporation documents and ownership chart
  • Proposed Malaysian shareholders and directors
  • Passport copies and residential addresses for foreign owners/directors
  • Planned services and a business plan
  • Goods to be handled and whether they are imported, exported, controlled, or hazardous
  • Expected vehicle fleet and warehouse size
  • Proposed warehouse location
  • Staffing plan, including any expatriate positions
  • Funding plan and expected start date

We can then map the incorporation, licensing, premises, customs, tax, payroll, and immigration steps. Exact setup time and cost depend on the chosen structure and approvals.

Setting up a data centre in Malaysia

There is no single “data centre licence.” A project needs coordinated investment, land, planning, utility, construction, and operating approvals. MIDA is the federal focal point for new data-centre investment projects. State and local authorities still handle land and development approvals.

21How do we set up the company and get investment approval?

Incorporate a Malaysian company with SSM, then submit the data-centre investment proposal to MIDA. If applying for investment incentives, check MIDA’s current criteria separately.

22What land and planning checks are needed?

Confirm the land title, zoning, land conditions, access, and whether land conversion or planning permission is needed. Submit the required planning, earthworks, road and drainage, and building plans through the local authority’s One Stop Centre (OSC). Requirements depend on the site and local council.

23How do we secure electricity supply?

Get written supply feasibility and a connection plan from TNB for the required load and project phases. Confirm the connection voltage, substation, cable route, cost, and expected delivery date. TNB’s application for a load above 100A is submitted by an Electrical Consultant Engineer. An application does not guarantee that the required capacity will be available by the requested date.

24Do we need an Energy Commission (ST) licence?

Check whether the facility needs an ST private installation licence. ST lists a licensing route for private installations of 5 MW and above. Also check the approvals required for on-site power generation or battery energy storage.

25What about water and sustainability?

Obtain written water-supply confirmation from the state water operator. Confirm the cooling design, expected water demand, and any water-reuse plan. MIDA’s sustainability guideline recommends avoiding water-stressed areas in Peninsular Malaysia with a Water Stress Index below 0.8, and recommends a design Water Usage Effectiveness (WUE) of 2.2 m³/MWh or lower. The guideline applies to DESAC incentive applications received through 31 December 2027; confirm other project requirements with MIDA and the state.

26Does a data centre need an EIA?

Ask the Department of Environment (DOE) to screen the whole project and associated works against the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015. An EIA is required when the proposed project is a prescribed activity. Do not assume every data centre automatically requires an EIA.

27What is needed for construction and completion?

Obtain the local authority’s approvals for building and related works. Before operation, complete inspections and obtain the required Certificate of Completion and Compliance (CCC). Confirm fire-safety approvals and whether a Fire Certificate applies to the building.

28Which equipment and workplace-safety approvals apply?

Check DOSH requirements for relevant equipment, such as lifts, pressure vessels, boilers, and power-driven lifting machinery. Covered lifting machinery needs design verification and a valid Certificate of Fitness before construction, installation, or use.

29Which operating business licence is needed?

Confirm the business-premises licence and any other local approvals with the relevant local authority. The company’s activities and the site’s approved use must match the planned operation.

30What is the recommended step-by-step process?

We recommend ten steps:

  1. Define the project. Confirm the location, IT load in MW, total power requirement, project phases, cooling system, water use, and whether the facility will be colocation, hyperscale, or for private use.
  2. Set up the Malaysian company. Decide the ownership and project structure. Incorporate through SSM, appoint the required locally resident director, and arrange a qualified company secretary.
  3. Submit the investment proposal to MIDA. Prepare the investor details, project value, capacity, timeline, proposed site, power and water plans, and expected local economic contribution.
  4. Screen sites before committing. Check title and land conditions, zoning, planning guidelines, access, flood risk, fibre routes, water availability, and nearby power infrastructure.
  5. Seek written utility feasibility. Appoint a qualified electrical consultant to apply to TNB for the required load and phased connection plan, and obtain written water-supply confirmation from the relevant state operator.
  6. Apply for planning and development approvals. Submit through the local authority’s OSC; the submission may include planning, earthworks, road and drainage, and building plans. Ask the local authority which application pathway applies to the site.
  7. Complete environmental and technical checks. Obtain DOE’s EIA screening decision and check ST electrical licensing, fire-safety requirements, and DOSH approvals for regulated equipment.
  8. Build, test, and obtain completion approvals. Complete the approved works, inspections, utility connections, and CCC before commissioning.
  9. Complete operating registrations. Obtain the applicable local business licence and complete the company, tax, employer, and operational registrations.
  10. Commission in phases. Bring each phase online only after its applicable utility, safety, and completion requirements are satisfied.

For a large multi-site programme of several hundred MW, treat each site and phase as its own approval and utility-capacity workstream. Malaysia’s national planning guideline categorises data centres above 25 MVA as “big.” TNB determines the actual voltage and connection design through its technical study.

31What information should we prepare for a first discussion?

Please share:

  • Preferred state and proposed site
  • IT load required for each phase
  • Required power capacity and target power-on date
  • Cooling system and water requirements
  • Greenfield development or acquisition of an existing project
  • Project timeline and intended operating model

Tell us what you need

Size, power, location, budget and timing. Crystal will reply personally with suitable options.

Send my requirement on WhatsAppCall +60 16-559 6624

More searches

Factory for rent in PenangFactory for sale in PenangWarehouse for rent in Penang and KulimIndustrial land for sale in Penang and KedahFactory and warehouse in Kulim, KedahBuyer's guide & calculators

Availability, prices and specifications change often and are confirmed on enquiry. General information only.

WhatsApp Crystal
Call the office