Centeline Home 百特地产 CENTELINE GROUP
EN

Industrial property · Penang & Kedah

Warehouse for rent in Penang and Kulim

Warehouses and logistics facilities for rent near Penang Port, the airport and the Butterworth–Kulim Expressway, including bonded and LMW-ready space. Tell us the floor area, bays and truck sizes you need.

Send my requirement on WhatsAppCall +60 16-559 6624

Handled personally by Crystal Tee, REN 26151 · IQI Champion 2024 & 2025

Buyer's guide & calculators →Foreign investor Q&A →
Warehouse for rent in Penang and Kulim
Factory and warehouse for rent in Kulim, next to Kulim Hi-Tech ParkAvailable now · Exclusive listingFactory and warehouse for rent in Kulim, next to Kulim Hi-Tech Park91,247 sq ft on 3.5 acres · 1,000A · 25 ft ceiling · LMW · Rent on requestSee photos and details →

Where to look

Prai & Butterworth

Close to Penang Port and the North–South Expressway, a strong choice for logistics, warehousing and heavier industry.

Bayan Lepas (Penang Island)

Penang's original Free Industrial Zone beside the international airport, home to many semiconductor and electronics plants.

Batu Kawan

A newer mainland industrial park beside the Second Penang Bridge, planned for high-technology manufacturing.

Kulim Hi-Tech Park & Kulim

Kedah's high-tech park and surrounding estates, a short drive from Penang mainland, with larger land parcels.

What we check for you

  • Power supply in amps or kV, and upgrade options for your machines
  • Ceiling height, floor loading, loading bays and truck access
  • Land title, tenure, zoning and any consent fees
  • LMW, free zone or bonded status if you export

How it works

  1. 01Tell us your requirement
  2. 02Receive a shortlist
  3. 03Visit the sites
  4. 04Negotiate and sign

Common questions

What is a bonded warehouse?

A bonded or licensed warehouse lets you store imported goods without paying import duty until they are released to the local market. It needs customs approval, and the building must meet customs requirements.

Can you find warehouses with loading docks?

Yes. We source raised-floor warehouses with dock levellers as well as ground-level loading bays. Tell us how many bays and what truck sizes you use.

How quickly can I move into a warehouse?

Ready-built warehouses can often be handed over within weeks once terms are agreed. New or renovated space takes longer. →

Tell us what you need

Size, power, location, budget and timing. Crystal will reply personally with suitable options.

Send my requirement on WhatsAppCall +60 16-559 6624

More searches

Factory for rent in PenangFactory for sale in PenangIndustrial land for sale in Penang and KedahFactory and warehouse in Kulim, KedahBuyer's guide & calculatorsForeign investor Q&A

Availability, prices and specifications change often and are confirmed on enquiry. General information only.

WhatsApp Crystal
Call the office